Searching Goglides
Loading matching companies, research, topics, and discussions.
Loading matching companies, research, topics, and discussions.
Search uses Goglides API results from the projection-backed discovery index. Private, draft, hidden, unpublished, and admin-only content stays out of public results.
Showing public results only.
Equinix reported FY2025 revenue of $9.2 billion, operating cash flow of $3.9 billion and Q1 2026 revenue of $2.4 billion. The thesis depends on interconnection demand, data-center utilization, power availability, debt capacity and capital efficiency.
Signed-in searches appear here after you use search.
Tag facets appear after tag usage counts are rebuilt.
Datavault AI's $2.0B structured financing term sheet could give the company a collateral base and global tokenization mandate, but the deal is non-binding, potentially dilutive, and loaded with proof gates.
OpenDatavault AI's Perpetuals.com agreement gives its RWA tokenization story a needed liquidity layer, but the investment case still depends on listings, trading volume, fee recognition, and cash collection.
OpenA highly bullish but source-gated Datavault AI analysis framing DVLT as a speculative public option on AI data ownership, tokenization, SanQtum edge infrastructure, CyberCatch optionality, and contract-to-cash proof gates.
OpenA Bloom Energy five-year double thesis focused on data-center distributed power, fuel-cell economics, backlog quality, margins, cash flow, and execution risk.
OpenA Coverage Bootstrap Bloom Energy company evaluation covering fuel cells, data-center power demand, revenue growth, adjusted EBITDA, margins, project execution, cash flow, and risk controls.
OpenBlockchAIn has a real 40 MW operating data center and an AI/HPC infrastructure pitch, but the latest filings show margin pressure, thin cash, heavy customer and energy-provider concentration, related-party control and non-binding pipeline claims.
OpenAI Infrastructure Acquisition Corp. is a newly public SPAC with $140.5 million in trust, $1.1 million of cash outside trust, no operating revenue, no announced target and an April 6, 2027 deadline. The current thesis is trust math, sponsor incentives and futur
OpenAEP has turned the utility growth story into a transmission-led data-center and industrial load story, lifting its 2026-2030 capital plan to $78 billion while preserving 2026 guidance. The investment case now depends on rate recovery, balance-sheet funding and
OpenTag facets appear after tag usage counts are rebuilt.